Monday 10 February 2014

Production Plan

As a group we decided what dates we should film during the half term, since this screenshot we have also realised that we may need to film twice during the half term to get the outside footage and the inside footage done correctly. After starting dating all the things we need to do on a calendar, I feel more comfortable with our time scale and feel as if we're managing it well. We decided to do some filming this week so that we have access to the lighting equipment we needed which we couldn't take with us during half term, the rest of the filming will be done during the half term as we need to record by a street and inside houses to get a realistic feel to our title sequence.



Sophie made this calendar on Microsoft Outlook and then emailed it to all of us so we can add to it aswell. I think Outlook was the clearest and easiest way to create a calendar as we can all have access to it when we want and the weather warnings will also be handy when it comes to doing our outside filming.

No comments:

Post a Comment